February wasn't nearly as productive for me as January was, but I did manage to achieve most of my quilty goals. So I'll be linking up for Fresh Sewing Day and at Pigtales and Quilts!
My biggest and most important goal this month was quilting and binding Daisy Chain. And I did that.
You can see pictures here.
Next was the Starburst Quiltalong. Not only did I manage to keep up with each weekly assignment, but I also quilted it and it is now ready for the parade on Monday next week at Happy Quilting. You can catch a glimpse of Starburst in the mosaic. The full reveal to come tomorrow.
There was also my Scrappy Trip top which I wanted to get done this month. And it got done! You can see a picture of the finished top (minus a potential couple of borders which I haven't decided on yet) here.
I wanted to make sure to complete Block 9 of the Fat Quarter Shop Designer Mystery BOM (because I've been known to accumulate those little envelopes for months!)... and it got done! You can see it in the mosaic as well.
And lastly, I set a goal for myself for February to finish rows 1 to 4 of Lori's Row Along. I managed to get rows 1, 2 and 3 done, but I'm still trying to find time for row 4 (maybe tonight?)
In addition to all of the above projects, I also made a mini quilt (pictures here), moved my sewing room to the laundry room and got started on a tote bag for myself. Overall, a pretty good month.
And how was February for you all?
Thank you for visiting!
Izzy
My biggest and most important goal this month was quilting and binding Daisy Chain. And I did that.
You can see pictures here.
Next was the Starburst Quiltalong. Not only did I manage to keep up with each weekly assignment, but I also quilted it and it is now ready for the parade on Monday next week at Happy Quilting. You can catch a glimpse of Starburst in the mosaic. The full reveal to come tomorrow.
There was also my Scrappy Trip top which I wanted to get done this month. And it got done! You can see a picture of the finished top (minus a potential couple of borders which I haven't decided on yet) here.
I wanted to make sure to complete Block 9 of the Fat Quarter Shop Designer Mystery BOM (because I've been known to accumulate those little envelopes for months!)... and it got done! You can see it in the mosaic as well.
And lastly, I set a goal for myself for February to finish rows 1 to 4 of Lori's Row Along. I managed to get rows 1, 2 and 3 done, but I'm still trying to find time for row 4 (maybe tonight?)
In addition to all of the above projects, I also made a mini quilt (pictures here), moved my sewing room to the laundry room and got started on a tote bag for myself. Overall, a pretty good month.
And how was February for you all?
Thank you for visiting!
Izzy
My you did get a lot of things done. Isn't it strange though, to not be posting our Schnibble? I can't wait until April.
ReplyDeleteWow, you have done well this month! Look forward to the parade on Monday:)
ReplyDeleteI'd say you had a great month! I love all of your quilt projects... and moving your sewing room is a huge project in and of itself.
ReplyDeleteYou have been very productive. Love the starburst quilt!
ReplyDelete